References

In Germany and Sweden, we develop wind, solar, battery storage, hydrogen, and methanol projects – from traditional standalone plants to integrated energy parks. From planning through to operations, our projects demonstrate how technical expertise, local engagement, and economic viability come together. 

solar wind battery

Rietz Energy Park bei Treuenbrietzen

  • Standort: Rietz bei Treuenbrietzen, Brandenburg

  • Technologien: Substation (126 MW), Wind Farm (14 MW), Solar Park Kiesgrube (11 MW), Battery Storage (30 MW)

  • Status: Solar and wind park as well as substation fully developed; battery storage in planning
  • Besonderheit: Integrated energy park with intelligent interplay of wind, solar, and battery storage – connected to its own substation. Optimal grid integration and maximum synergy effects due to the close proximity of all components.
wind hydrogen

Green Methanol Piteå (Sweden)

  • Standort: Piteå, Norrbotten, Northern Sweden

  • Technologien: 400 MW electrolyzer, CCU and methanization plant for the production of up to 300,000 tons green methanol per year

  • Status: Integration of a 400 MW wind farm at ready-to-build stage; environmental permits for electrolyzers and methanization plants applied for; pre-FID completed; ongoing investor negotiations
  • Besonderheit: Large-scale project for green hydrogen and methanol, powered by renewable electricity in Northern Sweden. Export and use as eSAF and eFuels. Strategically important project with national and regional impact on Swedens’s climate goals.
solar wind battery water

Innovative Energy Park Strausberg

  • Standort: Strausberg, Brandenburg
  • Technologien: Wind Farm (49 MW), Solar Park (50 MW), Battery Storage (40 MW), Electrolyzer (Hydrogen)

  • Status: Under development
  • Besonderheit: Hybrid project for the municipality of Strausberg: wind and solar park with battery storage and hydrogen production for local mobility solutions (particularly the local aviation industry) and regional energy supply. An example of local value creation and sector coupling.
solar wind battery

Christinendorf / Lüdersdorf Energy Park

  • Standort: Christinendorf / Lüdersdorf, Brandenburg

  • Technologien: Substation (80 MW), Solar Park (43 MW), Battery Storage (25 MW), Wind Turbine (6 MW)

  • Status: Under development
  • Besonderheit: Holistic project approach incorporating wind, solar, and battery storage connected to own substation. Focus on self-consumption and local energy supply.